01 · Part
Beat 00 · Stark Industries · Mark 85
MARK 85
jarvis initializing…
HUD narrative, systems tour, flight path — then a compact 3D suit finale.
Beat 01 · Nanotech rail
Suit assembly
Scroll to scrub the captured Mark 85 assembly sequence — real plates, not placeholder shapes.
Beat 02 · Systems tour
Diagnostics Live
Select any subsystem on the suit wireframe to query the live telemetry status and core energy distribution.
Arc Reactor
STABLEVibranium core output at peak yield. Emitting zero secondary radiation.
Helmet HUD
ACTIVEThreat projection and telemetry overlays linked directly to ocular sensors.
Palm Repulsors
CHARGINGFlight stabilizers calibrated. Arming sequence ready on manual discharge.
Boot Thrusters
STANDBYThrust vectors online. Capable of achieving Mach 2.4 under full load.
Beat 03 · Arc reactor
Unstable → locked
Scroll intensity. The reactor schematic charges, then locks to a steady burn.
output 0%
Beat 04 · Flight path
Sky is the runway
Scroll to climb. Altitude tape rises with the suit along the path.
Beat 10 · Interactive finale
Mark 85 stage
Scroll — the stage fills the screen, then pulls back into Suit online.
Outro · Mission complete
Suit online
Mark 85 — GSAP HUD story first, 3D suit as Beat 10 finale. Built with Astro × GSAP × Webflow Cloud.